Go to Admin » Appearance » Widgets » and move Gabfire Widget: Social into that MastheadOverlay zone
Related Expenses
Expenses and standards involved
l. Industrial and commercial registration fee
Industrial and commercial registration fees hall be charged as per the State’s stipulation
2. Tax registration fee
Tax registration fee shall be charged as per the State’s stipulation
3.Land deed tax
Land deed tax: enterprise that purchases land shall pay a lump-sum land deed tax; deed tax belongs to the transaction tax, that is, at 4% of the total land payment.
4.Land determined fee: 326 yuan/point. It is the national executive charge that is priced by the state and charged in lump sum by the development area’s land bureau for the state and transfer to the determination department.
5.Engineering quality supervision fee
Engineering quality supervision fee shall be charged at 2.5% of the project costing.
6. Large industry electricity consumption
1-10KV is 0.373 yuan/KWh
Other uses of electricity 35KV shall be charged at 0.364yuan/KWh, 110KV at0.355/KWh, and 220KV at 0.346yuan/KWh.The capacity of transformer to install under500KVA shall be charged: at the standard as aerial line, the subsidiary}is220yuan/KVA; at the standard as underground line, the subsidiary is 300 yuan/KVA.
7.Compensation fee for underground water resources
Ordinary water: 0.4 yuan/m3
Underground water: 0.6 yuan/m3
Mineral water: 0.6 yuan/m3
Water for living: I .60 yuan/m3
Water for industry: l .80 yuan/m3
Service sector (including capital construction): 2.50 yuan/m3
Special trade: 3.30 yuan/m3
Executive units: l .70 yuan/m3
(The foresaid fees include 0.40-yuan/m3 sewage treatment and 0.10 yuan/m3 public surcharges).
8. Rubbish clearance fee Residential
wastes: 5yuan/month/household
Firm’s wastes: 37 yuan/ton
Wastes from construction: 28 yuan/ton
Special trade waste: 60 yuan/ton
9. Natural gas fee: 1 .60 yuan/m3
10. Housing property registration fee 0.75 yuan/m3
1l. Labor contract identification and certificate fee: 3 yuan/person
File fee: 180 yuan for worker and 240yuan for officer per year (temporary)
Entrusting firm’s fi1e: 20 yuan / person per month
Personal file: 15 yuan / person per month
Non-native workers’ urban-burden-relief fee (including cost of production) 93 .5yuan/person per year
12. Rental Price for Standard Factory Buildings
Complete water, power and heating facilities
First floor: 0.5 yuan/m2 per day
Second floor: 0.46 yuan/m2 per day
Third floor: o.44 yuan/m2per day
Fourth floor: 0.42 yuan/m2per day
You must be logged in to post a comment Login